1 Opening(s)
1.0 Year(s) To 5.0 Year(s)
Not Disclosed by Recruiter
Job Description,
Supervision of Installation, Testing and Commissioning of All type of HVAC Equipment Like VRV ACS, NON VRV ACS, DUCTABLE UNITS, FRESH AIR FAN, EXHAUST FAN, AHU UNITS, TFA/HRW UNITS INSTALLATION ON SITE.
Monitoring and Supervising of DUCTING WORK INSTALLATION AS PER DRAWING and CUSTOMER REQUIREMENT.
Installation of All type of Outdoor ...
1 Opening(s)
1.0 Year(s) To 5.0 Year(s)
Not Disclosed by Recruiter
Job Description,
Supervision of Installation, Testing and Commissioning of All type of HVAC Equipment Like VRV ACS, NON VRV ACS, DUCTABLE UNITS, FRESH AIR FAN, EXHAUST FAN, AHU UNITS, TFA/HRW UNITS INSTALLATION ON SITE.
Monitoring and Supervising of DUCTING WORK INSTALLATION AS PER DRAWING and CUSTOMER REQUIREMENT.
Installation of All type of Outdoor ...
1 Opening(s)
1.0 Year(s) To 5.0 Year(s)
1.20 LPA TO 4.80 LPA
Works As HVAC Project Supervisor
Supervision of installation, Testing and commissioning of all types of HVAC Equipment like VRV ACS,NON VRV ACS, DUCTABLE UNITS, FRESH AIR FAN, EXHUAST FAN, AHU UNITS,TFA/HRW UNIT INSTALLATION ON SITE.
Monitoring and supervising of DUCTING WORK INSTALLATION AS PER DRAWING and CUSTOMER REQUIREMENT.
installation of all type of ...
1 Opening(s)
2.0 Year(s) To 5.0 Year(s)
2.50 LPA TO 3.50 LPA
Roles & Responsibilities include:1. E-Rickshaw/E-Cart Testing: Max Power Test and Max 30 min. power test using Dyno.2. E-Rickshaw/E-Cart Testing: Spray Suppression test.3. E-Rickshaw/E-Cart Testing: Brake Test.4. E-Rickshaw/E-Cart Testing: Max Speed Test.5. E-Rickshaw/E-Cart Testing: Weighment verification.6. E-Rickshaw/E-Cart Testing: Lighting Installation test.7. E-Rickshaw/E-Cart Testing: Horn Installation test.8. E-Rickshaw/E-Cart Testing: RVM installation test.9. ...
1 Opening(s)
3.0 Year(s) To 6.0 Year(s)
2.40 LPA TO 3.50 LPA
Roles & Responsibilities include:
Assistance in High-Speed EV 2/3-Wheeler Testing: Max Power Test and Max 30 min. power test using Dyno.
2. Assistance in High-Speed EV 2/3-wheeler Testing: Spray Suppression test.
3. Assistance in High-Speed EV 2/3-wheeler Testing: Brake est.
4. Assistance in High-Speed EV 2/3-wheeler Testing: Max Speed Test.
5. Assistance in High-Speed ...
1 Opening(s)
3.0 Year(s) To 8.0 Year(s)
3.00 LPA TO 6.00 LPA
Service Execution:1. Conduct overhauling, repair, and maintenance of various types of isolators (66kV to 400kV) to ensure operational reliability.2. Perform installation and commissioning of isolators as per industry standards and project- specific requirements.3. Diagnose and resolve technical issues during installation, commissioning, or troubleshooting activities.Project Management:4. Plan and execute service schedules, ...
1 Opening(s)
2.0 Year(s) To 7.0 Year(s)
Not Disclosed by Recruiter
Job Description:
The General Manager of Installations will have to coordinate with the CRMs of different areas in Surat. He would have to govern the CRMs to ensure that the customers of our machines are delivered a pleasant experience and that their erection job is hasslefree. He would also be responsible ...
1 Opening(s)
1.0 Year(s) To 5.0 Year(s)
3.00 LPA TO 6.00 LPA
The CRMs would report directly to the GM Installation.
The work of a CRM would include coordinating with the customers where erections jobs are yet to start or are ongoing. He would be the hands on guy for the GM Installations.
Under each CRM, there would be 3 to 4 installation teams ...
2 Opening(s)
2.0 Year(s) To 5.0 Year(s)
Not Disclosed by Recruiter
Job Requirement:• Bachelor’s degree in computer science or a similar field.• Knowledge of front-end technologies including CSS, JavaScript, HTML5, andjQuery.• Demonstrated experience with 1. WordPress installation, upgrade, customtheme & plugin development and WP Multisite 2. And/or Laravel installation,upgrades and development.• Experience working with debugging tools such as Chrome Inspector and ...
1 Opening(s)
2.0 Year(s) To 6.0 Year(s)
Not Disclosed by Recruiter
Job Profile :1) Primary Responsibility Is installation, commissioning, Troubleshooting and postinstallation services for VFDs and Panels.2) Require to Do troubleshooting for entire systems for working of product.3) Must Be Independently Do troubleshooting of VFD, iMCC, Control wiring andControl logic of panels as well as power equipment troubleshooting.4) Knowledge of Variable ...